King Salman Maritime Complex Rasal Khair

KING SALMAN Maritime COMPLEX Rasal Khair MAIN CLIENT: aramco Contractor: SEPCO ARABIA CO SUPPLY Contract: 500,000 M3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIED: 300,000 m3 BATCHING PLANTS: Two batching plant is currently operating at the Rasalkhair Plant. The plant was established in 2017 and is equipped with a batching system with a production capacity of […]
Marjan Increment Program‐onshore Oil Facilities (Package 6)

Marjan Increment Program‐onshore Oil Facilities (Package 6) MAIN Contractor: Hyundai Engineering Client: aramco SUPPLY Contract: 500,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIED: 350,000 m3 BATCHING PLANTS: Two batching plant is currently operating at the Marjan Increment Project. The plant was established in 2019 and is equipped with a batching system with a production capacity […]