Amiral Pkg 4

Amiral Pkg 4 MAIN Contractor: Hyundai E&C Client: Aramco SUPPLY Contract: 100,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIES: 30,000 M3 BATCHING PLANT: One batching plant is currently operating at the Amiral Plant. The plant was established in 2025 and is equipped with a batching system with a production capacity of 120 m³/hour. The batching […]