Master Gas System Expansion Phase 3 (MGS-3)

Master Gas System Expansion Phase 3 (MGS-3) MAIN Contractor: SEPCO arabia Client: aramco SUPPLY Contract: 100,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIES: 40,000 M3 BATCHING PLANTS: One batching plant is currently operating at the MGS III Project. The plant was established in 2025 and is equipped with a batching system with a production capacity […]