Jafurah Gas Plant Expansion 3

Jafurah Gas Plant Expansion 3 MAIN Contractor: Hyundai Client: aramco SUPPLY Contract: 150,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIED: 100,000 m3 BATCHING PLANTS: Three batching plant is currently operating at the Jafurah Region—Jafurah 1 & Jafurah 3. Jafurah 1 established in 2024 with one batching plant Manufactured – Liebherr, while Jafurah 3 was commissioned […]

Riyas ISF Project

Riyas ISF Project MAIN Contractor: Tecnicas Reunidas Client: aramco SUPPLY Contract: 250,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIED: 210,000 m3 BATCHING PLANTS: Two batching plant is currently operating at the Riyas Project. The plant was established in 2025 and is equipped with a batching system with a production capacity of 240 m³/hour. The batching […]

Marjan Increment Program‐onshore Oil Facilities (Package 6)

Marjan Increment Program‐onshore Oil Facilities (Package 6) MAIN Contractor: Hyundai Engineering Client: aramco SUPPLY Contract: 500,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIED: 350,000 m3 BATCHING PLANTS: Two batching plant is currently operating at the Marjan Increment Project. The plant was established in 2019 and is equipped with a batching system with a production capacity […]