1800/1980MW IPP CCGT PROJECT Taiba 1&2

MAIN Contractor: tiejun & china energy

CLIENT: ACWA POWER

SUPPLY Contract: 250,000 m3

Project Duration: on-going

APPROXIMATE VOLUME SUPPLIED: 200,000 M3

BATCHING PLANTS:

Two batching plant is currently operating at the Taiba 1 & 2 Plants. This plant was established in 2024 and is equipped with a batching system with a production capacity of 240 m³/hour. The batching plant is manufactured by KICE.

ICE PRODUCTION PLANT:

Two ice plant has been installed at the Taiba 1 & 2 Station. The ice plant has a production capacity of 70 tons per day and is manufactured by KTI.

WATER CHILLER PLANT:

Two Snowkey & Carrier chiller plant.

LABORATORY:                                  

Taiba 1& 2 station lab is equipped with all essential equipment in order to perform all the tests required during, before and after production. The lab has temperature-controlled curing tank for sample curing and compression machine, for aggregate testing the lab is capable to do the following test.

PROJECT HIGHLIGHTS:

ETE Readymix is proud to contribute to the development of the landmark Taiba 1 – 1800 MW IPP CCGT ProjectShandong Tiejun Electric Power and Taiba 2 – 1980 MW IPP CCGT Project- China Energy International with ACWA Power in Madinah — a major step forward in Saudi Arabia’s growing energy infrastructure. Ensuring a reliable and continuous supply of high-quality concrete.

In total, ETE Readymix will deliver approximately 300,000 m³ of concrete for both power plants — reinforcing our capability to support large-scale, high-impact infrastructure projects.

We are proud to play a part in building the foundations of Saudi Arabia’s energy future.