1800/1980MW IPP CCGT PROJECT Taiba 1&2
MAIN Contractor: tiejun & china energy
CLIENT: ACWA POWER
SUPPLY Contract: 250,000 m3
Project Duration: on-going
APPROXIMATE VOLUME SUPPLIED: 200,000 M3
BATCHING PLANTS:
Two batching plant is currently operating at the Taiba 1 & 2 Plants. This plant was established in 2024 and is equipped with a batching system with a production capacity of 240 m³/hour. The batching plant is manufactured by KICE.
ICE PRODUCTION PLANT:
Two ice plant has been installed at the Taiba 1 & 2 Station. The ice plant has a production capacity of 70 tons per day and is manufactured by KTI.
WATER CHILLER PLANT:
Two Snowkey & Carrier chiller plant.
LABORATORY:
Taiba 1& 2 station lab is equipped with all essential equipment in order to perform all the tests required during, before and after production. The lab has temperature-controlled curing tank for sample curing and compression machine, for aggregate testing the lab is capable to do the following test.
PROJECT HIGHLIGHTS:
ETE Readymix is proud to contribute to the development of the landmark Taiba 1 – 1800 MW IPP CCGT Project –Shandong Tiejun Electric Power and Taiba 2 – 1980 MW IPP CCGT Project- China Energy International with ACWA Power in Madinah — a major step forward in Saudi Arabia’s growing energy infrastructure. Ensuring a reliable and continuous supply of high-quality concrete.
In total, ETE Readymix will deliver approximately 300,000 m³ of concrete for both power plants — reinforcing our capability to support large-scale, high-impact infrastructure projects.
We are proud to play a part in building the foundations of Saudi Arabia’s energy future.