Amiral Pkg 4
MAIN Contractor: Hyundai E&C
Client: Aramco
SUPPLY Contract: 100,000 m3
Project Duration: on-going
APPROXIMATE VOLUME SUPPLIES: 30,000 M3
BATCHING PLANT:
One batching plant is currently operating at the Amiral Plant. The plant was established in 2025 and is equipped with a batching system with a production capacity of 120 m³/hour. The batching plant is manufactured by KICE.
ICE PRODUCTION PLANT:
One Ice plant has been installed at the Amiral Station. The ice plant has a production capacity of 40 tons per day and is manufactured by KTI.
WATER CHILLER PLANT:
Amiral Station is equipped with the most recent and modern Snowkey chiller plant.
LABORATORY:
Amiral Station lab is equipped with all essential equipment in order to perform all the tests required during, before and after production. The lab has temperature controlled curing tank for sample curing and compression machine, for aggregate testing the lab is capable to do the following test:
KEY HIGHLIGHTS:
ETE Readymix is playing a crucial role in the development of the landmark Amiral Petrochemical Complex, representing a significant step in Saudi Arabia’s ongoing industrial growth. The company has been awarded a major contract by Hyundai Engineering & NSH, the main contractor for the Aramco-backed project, to supply all the concrete required for the critical Utilities, Flares, and Interconnecting Systems (Amiral Package 4).
To meet the demanding requirements of this project, ensuring a continuous and reliable supply to support the project’s advanced structural works.
ETE Readymix is responsible for supplying approximately 125,000 m³ of concrete for Amiral Package 4, a substantial undertaking that highlights the company’s capability and commitment to delivering large-scale infrastructure projects.
The Amiral Complex, integrated with the SATORP refinery, represents a key component of Saudi Arabia’s strategy to expand its petrochemical sector and support the Kingdom’s economic diversification goals.