FADhili gas plant
MAIN Contractor: Samsung Engineering
Client: aramco
SUPPLY Contract: 400,000 m3
Project Duration: on-going
APPROXIMATE VOLUME SUPPLIED: 200,000 m3
BATCHING PLANTS:
Two batching plant is currently operating at the Fadilli Project. The plant was established in 2025 and is equipped with a batching system with a production capacity of 240 m³/hour. The batching plant is manufactured by KICE.
ICE PRODUCTION PLANT:
One ice plant has been installed at the Fadilli Station. The ice plant has a production capacity of 70 tons per day and is manufactured by Snowkey.
WATER CHILLER PLANT:
One Snowkey chiller plant.
LABORATORY:
Fadhili station lab is equipped with all essential equipment in order to perform all the tests required during, before and after production. The lab has temperature controlled curing tank for sample curing and compression machine, for aggregate testing the lab is capable to do the following.
PROJECT HIGHLIGHTS:
ETE Readymix is proud to contribute to the development of the Fadhili Gas Plant located in Eastern Province – a major infrastructure initiative led by Aramco to enhance the Kingdom’s gas processing capabilities.
Aramco has awarded Engineering, Procurement, and Construction (EPC) contracts to Samsung Engineering Company, GS Engineering & Construction Corporation, and Nesma & Partners. As a key contributor to this initiative, ETE Ready mix has been entrusted with the concrete supply scope, reinforcing its reputation for operational excellence and technical expertise. Ensuring consistent, high-quality concrete production aligned with project requirements. With a total demand of 500,000 m³ of concrete.
The Fadhili Gas Plant expansion represents a cornerstone of Saudi Arabia’s energy strategy, aimed at strengthening domestic gas production and supporting long-term economic growth. ETE Ready mix’s involvement highlights its continued leadership in delivering mission-critical construction solutions for projects of national importance.