PP12 Expansion CCGT IPP Project Durma

MAIN Contractor: sepco 3 (Tiejuin)

Client : SEC

SUPPLY Contract: 200,000 m3

Project Duration: on-going

APPROXIMATE VOLUME SUPPLIED: 85,000 M3

BATCHING PLANTS:

Two batching plant is currently operating at the Durma IPP Project. The plant was established in 2025 and is equipped with a batching system with a production capacity of 240 m³/hour. The batching plant is manufactured by KICE.

ICE PRODUCTION PLANT:

One ice plant has been installed at the Durma Station. The ice plant has a production capacity of 70 tons per day and is manufactured by Snowkey.

WATER CHILLER PLANT:

One Trane chiller plant.

LABORATORY:                         

Durma station lab is equipped with all essential equipment in order to perform all the tests required during, before and after production. The lab has temperature controlled curing tank for sample curing and compression machine, for aggregate testing the lab is capable to do the following.

PROJECT HIGHLIGHTS:

PP12 Expansion CCGT Project – Durma

ETE Readymix is proud to contribute to the development of the landmark PP12 Expansion CCGT ProjectSepco III, 380 kv Substation- Alfanar, and Al Gihaz, with Saudi Electricity Company (SEC), Saudi Power Procurement Company (SPPC) & Saudi Aramco Approval We have as the project owners located west/northwest of Riyadh—, ensuring a reliable and continuous supply of high-quality concrete.

In total, approximately 200,000 m³ of concrete will be delivered for the project—demonstrating ETE Readymix’s capability to support large-scale, high-impact infrastructure developments. an important milestone in Saudi Arabia’s expanding energy infrastructure.

We are proud to play a role in building the foundations of Saudi Arabia’s energy future.