RASTANURA PLANT

RASTANURA PLANT BATCHING PLANTS: Two batching plant is currently operating at the Rastanura Plant. The plant was established in 2017 and is equipped with a batching system with a production capacity of 240 m³/hour. The batching plant is manufactured by KICE. ICE PRODUCTION PLANT: One Ice plant has been installed at the Rastanura Station. The […]
Shaqra Wind Power Project

Shaqra Wind Power Project MAIN Contractor: china energy CLIENT: SPPC SUPPLY Contract: 150,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIED: M3 BATCHING PLANTS: Two batching plant is currently operating at the Shaqra Plant. The plant was established in 2026 and is equipped with a batching system with a production capacity of 240 m³/hour. The batching […]
AL AHSA PLANT

AL AHSA PLANT BATCHING PLANTS: Three batching plant is currently operating at the Al Hassa Plant. The plant was established in 2006 and is equipped with a batching system with a production capacity of 360 m³/hour. The batching plant is manufactured by One WEMIX & TWO KICE. ICE PRODUCTION PLANT: Two ice plant has been […]
PP12 Expansion CCGT IPP Project Durma

PP12 Expansion CCGT IPP Project Durma MAIN Contractor: sepco 3 (Tiejuin) Client : SEC SUPPLY Contract: 200,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIED: 85,000 M3 BATCHING PLANTS: Two batching plant is currently operating at the Durma IPP Project. The plant was established in 2025 and is equipped with a batching system with a production […]
Amiral Pkg 4

Amiral Pkg 4 MAIN Contractor: Hyundai E&C Client: Aramco SUPPLY Contract: 100,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIES: 30,000 M3 BATCHING PLANT: One batching plant is currently operating at the Amiral Plant. The plant was established in 2025 and is equipped with a batching system with a production capacity of 120 m³/hour. The batching […]
Master Gas System Expansion Phase 3 (MGS-3)

Master Gas System Expansion Phase 3 (MGS-3) MAIN Contractor: SEPCO arabia Client: aramco SUPPLY Contract: 100,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIES: 40,000 M3 BATCHING PLANTS: One batching plant is currently operating at the MGS III Project. The plant was established in 2025 and is equipped with a batching system with a production capacity […]
King Salman Maritime Complex Rasal Khair

KING SALMAN Maritime COMPLEX Rasal Khair MAIN CLIENT: aramco Contractor: SEPCO ARABIA CO SUPPLY Contract: 500,000 M3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIED: 300,000 m3 BATCHING PLANTS: Two batching plant is currently operating at the Rasalkhair Plant. The plant was established in 2017 and is equipped with a batching system with a production capacity of […]
Jafurah Gas Plant Expansion 3

Jafurah Gas Plant Expansion 3 MAIN Contractor: Hyundai Client: aramco SUPPLY Contract: 150,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIED: 100,000 m3 BATCHING PLANTS: Three batching plant is currently operating at the Jafurah Region—Jafurah 1 & Jafurah 3. Jafurah 1 established in 2024 with one batching plant Manufactured – Liebherr, while Jafurah 3 was commissioned […]
Riyas ISF Project

Riyas ISF Project MAIN Contractor: Tecnicas Reunidas Client: aramco SUPPLY Contract: 250,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIED: 210,000 m3 BATCHING PLANTS: Two batching plant is currently operating at the Riyas Project. The plant was established in 2025 and is equipped with a batching system with a production capacity of 240 m³/hour. The batching […]
FADHILI

FADhili gas plant MAIN Contractor: Samsung Engineering Client: aramco SUPPLY Contract: 400,000 m3 Project Duration: on-going APPROXIMATE VOLUME SUPPLIED: 200,000 m3 BATCHING PLANTS: Two batching plant is currently operating at the Fadilli Project. The plant was established in 2025 and is equipped with a batching system with a production capacity of 240 m³/hour. The batching […]